What M&E tenders look like
Councils, housing providers, the NHS, schools and police forces all buy planned and reactive maintenance of heating, electrical, ventilation and other building services. Two recent notices on Find a Tender show the format:
- Merseyside Police: planned and reactive M&E maintenance. The Police & Crime Commissioner for Merseyside and Chief Constable for Merseyside published a tender notice on 16 October 2026 for "planned and reactive maintenance works for Mechanical and Electrical services", estimated at £5m excluding VAT, from 1 April 2027 to 31 March 2030 with two optional one-year extensions. The award criteria were price 45%, quality 40% and social value, sustainability, net zero and cyber security 15%, and the notice marked it as suitable for SMEs (Find a Tender 099772-2026).
- Staffordshire County Council: responsive maintenance framework. The council's framework, with its contract details notice published on 23 November 2026, has separate Mechanical and Electrical lots for work orders under £5,000 across council buildings including schools, care homes, offices and fire stations. Emergency call-outs require attendance within 2 hours of an oral request, 24 hours a day, 365 days a year (Find a Tender 110605-2026).
Search live M&E opportunities free with our tender search, or see our M&E tenders page.
What the Procurement Act 2023 lets buyers ask for
Under section 22 of the Procurement Act 2023, a buyer can set conditions of participation only where they are a proportionate way of making sure you have the legal and financial capacity, or the technical ability, to perform the contract:
- Qualifications, experience and technical ability. Conditions can relate to all three, which is where registrations and engineer qualifications come in.
- Equivalents. Buyers must not require particular qualifications without allowing for their equivalents. If a tender names one scheme and you hold another that covers the same work, check the documents and ask a clarification question if it is unclear.
- Verifiable evidence. Buyers can ask for evidence that someone other than you can verify, such as a certificate or a public register entry.
- Proportionality. The buyer must have regard to the nature, complexity and cost of the contract.
- Subcontractors. You can be treated as meeting a condition through a supplier you will subcontract to under a legally binding arrangement, for example a specialist lift or F-Gas subcontractor.
Our PSQ guide covers how these questions appear at selection stage.
Gas: Gas Safe registration
Regulation 3 of the Gas Safety (Installation and Use) Regulations 1998 says no one may carry out work on a gas fitting unless they are competent. It also says no employer may allow employees to work on a gas fitting or service pipework, and no self-employed person may do that work, unless they are a member of a class of persons approved by the Health and Safety Executive. In practice that is the Gas Safe Register, which GOV.UK lists alongside the competent person schemes for gas combustion appliances and heating and hot water work. GOV.UK notes it is not technically a competent person scheme, but its installers have the same responsibilities for complying with building regulations.
For a gas tender, have your company registration number ready and a list of engineers with the gas work categories each is registered for, matched to the appliances in the specification.
Electrical: NICEIC, NAPIT and other competent person schemes
Competent person schemes let installers self-certify certain building work instead of getting building regulations approval. GOV.UK's list of current schemes (last updated 17 September 2026) includes Certsure LLP trading as NICEIC and NAPIT Registration Limited, among others:
- Electrical installations in dwellings: BESCA, Blue Flame Certification, Certsure (NICEIC), NAPIT and OFTEC are authorised for fixed low or extra-low voltage installations.
- Buildings other than dwellings: BESCA, Blue Flame Certification, Certsure and NAPIT are authorised for installing lighting or electrical heating systems.
- Other M&E work: schemes are also authorised for heating and hot water, mechanical ventilation and air conditioning, and microgeneration and renewable technologies.
- Competence is assessed. To register, installers must meet the relevant minimum technical competence requirements.
Social housing electrical testing. If you bid for housing electrical work, know the client's duties. GOV.UK's electrical safety standards guidance explains that the regulations were extended to the social rented sector in England in 2025. Landlords must have electrical installations inspected and tested by a qualified person at least every 5 years, meeting the standards in BS 7671, and obtain a report (usually an Electrical Installation Condition Report). Remedial or further investigative work the report says is needed must be completed within 28 days, or sooner if the report specifies. Social landlords must also have electrical equipment they provide checked at least every 5 years. For social tenancies granted before 1 December 2025, the first inspections and equipment checks had to be done before 1 November 2026. Expect housing tenders to ask how you will schedule inspections, report results and complete remedials within those deadlines.
Air conditioning, refrigeration and heat pumps: F-Gas
GOV.UK's company certification guidance says your company, including sole traders, must be certified by an approved body to install, repair, maintain or decommission stationary equipment containing F gas operated by others, such as air conditioning and refrigeration:
- Certification bodies. For stationary refrigeration, air conditioning and heat pump systems, the approved bodies are Refcom Certification, F-Gas Register (Quidos) and Bureau Veritas UK.
- What you must show. That you employ enough trained staff to do the work and have a written procedure for handling F gases safely and minimising emissions.
- Renewal. Company certification must be renewed every 3 years.
Engineers need their own qualifications too. The qualifications guidance says a category 1 certificate covers all activities, while categories 2, 3 and 4 cover narrower work, such as category 4 for leak checks that do not break into the refrigeration circuit. Match each engineer's category to the systems and tasks in the specification.
Planned maintenance and reactive response
The quality questions in maintenance tenders usually test how you will run the service, not just who you are. Expect to explain:
- Your planned preventive maintenance (PPM) regime. If the specification refers to a maintenance standard such as SFG20, which describes itself as the industry standard for building maintenance with more than 1,500 maintenance schedules, show how you will map the client's assets to it and flag statutory tasks.
- Statutory inspections. For example, under regulation 9 of the Lifting Operations and Lifting Equipment Regulations 1998, lifting equipment for lifting people that is exposed to conditions causing deterioration must be thoroughly examined at least every 6 months, or in line with an examination scheme. Lift maintenance bids should show how examinations are scheduled and defects acted on.
- Reactive response times. Show how you meet stated attendance times out of hours and at weekends, as in Staffordshire's 2-hour emergency requirement: on-call rotas, engineer locations, vans and stock.
- Reporting. How the client sees jobs logged, attended, completed and certified, and how you report KPIs.
Our method statement guide covers how to structure these answers to the scoring criteria.
Commissioning and handover
For installation work, buyers want to know the job ends with systems that are tested, documented and handed over properly. Under the Building Regulations 2010, regulation 44 requires the person carrying out work on fixed building services, where it applies, to give the building control authority a notice confirming the systems have been commissioned in accordance with an approved procedure. In England, where no completion notice applies, that is no more than 30 days after the work is completed. Regulation 40 requires the person carrying out the work to give the owner, within five days of completion, enough information about the building, the fixed building services and their maintenance requirements for it to be run without using more fuel and power than is reasonable.
In a tender, set out your commissioning sequence, who witnesses and signs off tests, what goes in the handover pack (certificates, commissioning records, operation and maintenance information) and how you train the client's staff.
Energy efficiency and carbon reduction
Decarbonisation and energy are increasingly scored in M&E tenders, as Merseyside's 15% social value, sustainability and net zero weighting shows. For in-scope central government contracts above £5m a year (including VAT), PPN 006 means you may also need a Carbon Reduction Plan: see our Carbon Reduction Plan (PPN 006) guide. In quality answers, link energy claims to the client's own assets and give the measures you will report against.
Health and safety: permit-to-work and safe isolation
M&E work often involves isolating live systems in occupied buildings, so buyers look closely at your safe systems of work:
- Electrical isolation. Regulation 12 of the Electricity at Work Regulations 1989 requires suitable means for cutting off the supply and isolating electrical equipment where necessary to prevent danger, and defines isolation as disconnection and separation from every source of electrical energy that is secure. Regulation 13 requires adequate precautions to stop equipment made dead from becoming charged during the work.
- Permit-to-work. HSE's permit to work guidance gives hot work such as welding, cutting into pipework carrying hazardous substances and work that requires electrical or mechanical isolation as examples of high-risk jobs where a written permit may be needed. HSE stresses that a permit is not a replacement for robust risk assessment, that jobs not finished in one shift should be left in a safe state with clear instructions, and that the system should include hand-over of plant on completion.
Show how your permits work alongside the client's own systems, especially in hospitals, schools and occupied housing. Your SSIP or Common Assessment Standard certification is often checked too: see our CHAS, Constructionline and SafeContractor guide.
Evidence checklist for an M&E tender
| What the buyer is checking | Evidence to have ready |
|---|---|
| Gas competence | Gas Safe company registration and engineers' registered work categories |
| Electrical competence | Competent person scheme membership (such as NICEIC or NAPIT) and engineers' qualifications |
| F-Gas | Company certificate from an approved body and each engineer's F-Gas category |
| Planned maintenance | Your PPM regime, the standard it follows and how statutory tasks are flagged |
| Reactive response | On-call rota, attendance times, engineer coverage and reporting |
| Commissioning and handover | Commissioning procedure, sign-off, handover pack contents and client training |
| Health and safety | Permit-to-work and isolation procedures, RAMS and SSIP or CAS certification |
Requirements vary by buyer, so read the specification and selection criteria for each opportunity. For the wider rules on how public buying works, read our main guide: Procurement Act 2023: what suppliers and SMEs need to know.
How West Gate can help
- Find the work: search open M&E contracts free with our tender search, or set up free tender alerts for your sectors and regions.
- Outsource the bid: our bid writers shortlist opportunities, check your registrations against the buyer's requirements before you commit, and write quality, method statement and social value answers to the scoring criteria, so your engineers stay on site. West Gate has a 90%+ win rate† and does not support competing bidders on the same opportunity.
- Talk it through: book a free 30-minute call to check a live M&E tender against your registrations and capacity.
† Figures based on bids West Gate submitted and contracts awarded in 2025.
Frequently asked questions
Do I need Gas Safe registration to bid for a gas maintenance contract?
To do the work, yes. The Gas Safety (Installation and Use) Regulations 1998 say employers and self-employed people doing work on gas fittings must be members of a class of persons approved by HSE, which in practice is the Gas Safe Register. If you subcontract the gas work, the buyer can treat you as meeting a condition through that subcontractor under a legally binding arrangement.
Can a buyer insist on NICEIC rather than NAPIT?
Not without allowing equivalents. Section 22 of the Procurement Act 2023 says conditions of participation may not require particular qualifications without allowing for their equivalents. Both are listed by GOV.UK as authorised competent person schemes for electrical installations.
Does my company need an F-Gas certificate as well as my engineers?
If you install, repair, maintain or decommission stationary air conditioning, refrigeration or heat pump equipment containing F gas for others, yes. GOV.UK says the company, including sole traders, needs certification from an approved body, renewed every 3 years, and each engineer needs their own qualification.
How often must passenger lifts be thoroughly examined?
Under regulation 9 of LOLER 1998, lifting equipment for lifting people that is exposed to conditions causing deterioration must be thoroughly examined at least every 6 months, or in line with an examination scheme.
Want us to handle this for a live bid? See our M&E tender writing, or our full range of bid writing services.
Sources
- Procurement Act 2023, section 22: conditions of participation
- Find a Tender notice 099772-2026: Reactive and Planned Maintenance - Mechanical & Electrical (Merseyside)
- Find a Tender notice 110605-2026: Responsive Property Maintenance and Minor Works framework (Staffordshire County Council)
- Gas Safety (Installation and Use) Regulations 1998, regulation 3 (legislation.gov.uk)
- Competent person scheme: current schemes and how schemes are authorised (GOV.UK)
- Electrical safety standards in the private and social rented sectors: guidance (GOV.UK)
- Company certification to work with F gas (GOV.UK)
- Qualifications to work with F gas (GOV.UK)
- SFG20: the industry standard for building maintenance
- Lifting Operations and Lifting Equipment Regulations 1998, regulation 9 (legislation.gov.uk)
- Building Regulations 2010, regulation 44: commissioning (legislation.gov.uk)
- Building Regulations 2010, regulation 40: information about use of fuel and power (legislation.gov.uk)
- PPN 006: Taking account of Carbon Reduction Plans (GOV.UK)
- Electricity at Work Regulations 1989, regulation 12 (legislation.gov.uk)
- Electricity at Work Regulations 1989, regulation 13 (legislation.gov.uk)
- Permit to work systems (HSE)
General information, not legal advice. Always follow the tender documents and take legal advice where needed.